WP6 Analysis of seasonal performance and initial assessment

Objectives

• Study of the heat pump operation in the global heating and cooling system for each case study and identification of additional design or control improvements.
• Analysis of the integration of the heat pump with other equipment in the Global Energy System for each case study and identification of new design or control requirements.
• Estimation of the seasonal performance factor for each heat pump-installation.
• Compilation of the necessary information about the possible final seasonal performance of the developed heat pumps for the Midterm project review.